August 20, 2026
  • August 20, 2026

NHSRCL erects first steel bridge for Mumbai-Ahmedabad High Speed Rail Corridor

By on October 6, 2023 0 26 Views

The National High-Speed Rail Corporation Limited (NHSRCL) has successfully erected the first steel bridge, measuring 70 meters in length, over National Highway-53 in Surat in Gujarat, for the Mumbai-Ahmedabad High-Speed Rail Corridor.

Leave a comment

Your email address will not be published. Required fields are marked *