The Northern Railway Lucknow division, in collaboration with the UP State Bridge Corporation Limited (UPSBCL), is constructing a 652-meter-long railway overbridge (ROB) on NH 135A to facilitate smooth traffic movement between Ayodhya city and Darshannagar. The under-construction ROB includes a 45.4-meter-long bow string steel girder over the double rail track.